NERC CIP: Automated NERC Compliance for Energy & Infrastructure
NERC CIP compliance costs utilities millions annually in manual evidence gathering, consultant hours, and audit preparation. One missed deadline can trigger million-dollar penalties.
The Challenge in Numbers
- Average CIP audit prep costs $350K
- Manual evidence collection takes 3-4 months
- $1M/day penalties for non-compliance
- 60% of utilities fail at least one audit finding
How NERC CIP Works
NERC CIP automates the entire compliance lifecycle — continuous monitoring, automated evidence collection, and one-click audit package generation.
Key Capabilities
Continuous Control Monitoring
Automated assessment of all CIP standards with real-time compliance dashboards.
Automated Evidence Collection
Evidence gathered continuously from your systems — always audit-ready.
One-Click Audit Package
Generate complete audit packages mapped to RSAW templates in minutes, not months.
POA&M Tracking
Automated tracking and remediation workflows for Plan of Actions and Milestones.
Why NERC CIP Is Different
Unlike generic solutions that require extensive customization, NERC CIP is purpose-built for Energy & Infrastructure. It addresses the specific regulatory, operational, and technical requirements that general-purpose tools miss.
- Continuous Control Monitoring — Automated assessment of all CIP standards with real-time compliance dashboards.
- Automated Evidence Collection — Evidence gathered continuously from your systems — always audit-ready.
- One-Click Audit Package — Generate complete audit packages mapped to RSAW templates in minutes, not months.
- POA&M Tracking — Automated tracking and remediation workflows for Plan of Actions and Milestones.
Who Should Use NERC CIP?
Organizations in the Energy & Infrastructure space that are facing the challenges described above — and that need a purpose-built, production-ready solution rather than a generic platform requiring months of configuration.
Getting Started
NERC CIP is available at $499/mo with a straightforward onboarding process. Most organizations are production-ready within weeks, not months.
Ready to solve nerc cip compliance costs utilities millions annually in manual evidence gathering, consultant hours, and audit preparation? Learn more about NERC CIP and see how it can transform your energy & infrastructure operations.