Interconnect Queue: Accelerated Grid Interconnection for Energy & Infrastructure
Interconnection queues are backed up 3-5 years with over 2,000 GW of projects waiting. Manual cluster studies and opaque cost allocation delay clean energy deployment.
The Challenge in Numbers
- Average queue wait: 3.7 years
- 70% of queued projects withdraw before study completion
- $150K average cost to reach interconnection agreement
- Manual cluster studies bottleneck the process
How Interconnect Queue Works
Interconnect Queue digitizes and automates the entire interconnection lifecycle — from application to signed interconnection agreement.
Key Capabilities
Automated Screening
Fast technical screening against available capacity, thermal limits, and stability constraints.
Cluster Study Automation
Automated power flow and stability analysis across multiple project scenarios.
Cost Allocation Engine
Transparent, rules-based cost allocation that satisfies FERC Order 2023 requirements.
Developer Portal
Self-service portal for developers to submit applications, track progress, and view queue positions.
Why Interconnect Queue Is Different
Unlike generic solutions that require extensive customization, Interconnect Queue is purpose-built for Energy & Infrastructure. It addresses the specific regulatory, operational, and technical requirements that general-purpose tools miss.
- Automated Screening — Fast technical screening against available capacity, thermal limits, and stability constraints.
- Cluster Study Automation — Automated power flow and stability analysis across multiple project scenarios.
- Cost Allocation Engine — Transparent, rules-based cost allocation that satisfies FERC Order 2023 requirements.
- Developer Portal — Self-service portal for developers to submit applications, track progress, and view queue positions.
Who Should Use Interconnect Queue?
Organizations in the Energy & Infrastructure space that are facing the challenges described above — and that need a purpose-built, production-ready solution rather than a generic platform requiring months of configuration.
Getting Started
Interconnect Queue is available at $299/mo with a straightforward onboarding process. Most organizations are production-ready within weeks, not months.
Ready to solve interconnection queues are backed up 3-5 years with over 2,000 gw of projects waiting? Learn more about Interconnect Queue and see how it can transform your energy & infrastructure operations.